Key Insights
The North America data center construction market is experiencing robust growth, driven by the increasing demand for cloud computing, big data analytics, and the proliferation of digital services. The market's compound annual growth rate (CAGR) of 6.20% from 2019 to 2024 indicates a significant expansion, projected to continue through 2033. Key drivers include the expanding IT and telecommunications sectors, the growing need for secure data storage and processing within BFSI (Banking, Financial Services, and Insurance) and government entities, and the rise of healthcare data management. The market is segmented by various infrastructure components (Power Distribution Units, racks, cabinets, servers, networking equipment, and cooling systems), end-user sectors, data center tiers, and size. Large and mega data centers are contributing significantly to the overall market expansion, fueled by hyperscale cloud providers' ongoing investments in infrastructure capacity. While construction costs and skilled labor shortages present some challenges, the overall market outlook remains positive due to the consistent demand for digital infrastructure and the strategic importance of data centers across various industries.
Significant regional variations exist within North America. The United States, with its established technology hubs and robust economy, is expected to command the largest market share. Canada and Mexico, although having smaller markets, are also exhibiting growth, especially as they attract foreign investment and develop their own digital infrastructures. The market is characterized by a mix of large, established construction companies and specialized data center infrastructure providers. Competition is intense, with companies striving for differentiation through expertise in design and engineering, specialized construction methodologies, and strong client relationships. Future growth is likely to be influenced by technological advancements, such as AI and IoT, increasing cybersecurity concerns, and the need for sustainable and energy-efficient data center designs. This will necessitate continued innovation in construction materials and practices, and a focus on meeting stringent environmental regulations.

North America Data Center Construction Market: A Comprehensive Report (2019-2033)
This in-depth report provides a comprehensive analysis of the North America data center construction market, offering valuable insights for investors, industry stakeholders, and strategic decision-makers. The study covers the period from 2019 to 2033, with a focus on the forecast period from 2025 to 2033, using 2025 as the base year. The report delves into market dynamics, leading players, key trends, and future growth prospects, incorporating extensive data and analysis to paint a clear picture of this rapidly evolving sector. Key segments analyzed include Power Distribution Unit (PDU), Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, and Other Infrastructure. End-user analysis covers IT & Telecommunication, BFSI, Government, Healthcare, and Other End Users. Tier types (Tier 1, Tier 2, Tier 3), and Data Center sizes (Small, Medium, Large, Mega, Massive) are also explored, along with Infrastructure types including Cooling and Power Infrastructure.
North America Data Center Construction Market Dynamics & Concentration
The North America data center construction market is characterized by a moderately concentrated landscape, with a handful of major players holding significant market share. In 2024, the top 5 companies collectively held an estimated 35% market share, indicating room for both expansion and consolidation. Market concentration is influenced by factors such as extensive capital requirements, specialized expertise, and long-term project timelines. Innovation is a crucial driver, with continuous advancements in cooling technologies, power infrastructure, and security systems shaping market dynamics. Stringent regulatory frameworks concerning environmental impact and data security significantly impact construction practices. While no direct product substitutes exist for data center construction, alternative approaches to data storage and processing, such as cloud computing, pose indirect competition. End-user trends show a strong shift towards hyperscale data centers, driving demand for large-scale construction projects. Mergers and acquisitions (M&A) activity remains significant, with an estimated xx M&A deals closed in the historical period (2019-2024), further consolidating market power.
- Key Metrics:
- Top 5 companies market share (2024): 35%
- Estimated M&A deals (2019-2024): xx
- Average project size (2024): xx Million USD
North America Data Center Construction Market Industry Trends & Analysis
The North America data center construction market exhibits robust growth, driven by several key factors. The burgeoning digital economy and the escalating demand for data storage and processing are the primary growth engines. Technological disruptions, such as the increasing adoption of edge computing and the expansion of 5G networks, fuel the need for decentralized data centers, boosting market growth. Consumer preferences for seamless digital experiences and increased reliance on cloud services further contribute to market expansion. Competitive dynamics are characterized by intense rivalry among established players and the emergence of new entrants, leading to innovation and price optimization. The market is estimated to have registered a CAGR of xx% during the historical period (2019-2024), and is projected to maintain a CAGR of xx% during the forecast period (2025-2033). Market penetration of advanced technologies like liquid cooling and AI-driven energy management systems is gradually increasing.

Leading Markets & Segments in North America Data Center Construction Market
The US dominates the North America data center construction market, accounting for approximately xx% of the total market value in 2024. Within the US, California, Texas, and Virginia are key regional hubs.
- Leading Segments:
- End-User: The IT & Telecommunication sector accounts for the largest segment share, driven by hyperscale data center construction.
- Data Center Size: The Mega and Massive data center segments are exhibiting high growth rates due to increasing demand for large-scale data storage and processing capabilities.
- Infrastructure: Power infrastructure constitutes a significant segment, with rising demand for reliable and efficient power supply solutions.
This dominance is driven by a strong concentration of major technology companies, extensive investments in digital infrastructure, and supportive government policies. Factors such as robust economic growth, well-developed infrastructure, and a skilled workforce contribute significantly to the market's performance in this region.
North America Data Center Construction Market Product Developments
Recent product innovations focus on enhancing energy efficiency, improving security, and optimizing data center operations. Modular data center designs, prefabricated components, and advanced cooling technologies are gaining traction, improving construction speed and reducing costs. These advancements enhance the scalability and flexibility of data center infrastructure, aligning with the evolving needs of the market. Increased focus on sustainability through the use of renewable energy sources is becoming a key competitive advantage.
Key Drivers of North America Data Center Construction Market Growth
The North America data center construction market’s growth is propelled by several factors. Firstly, the exponential rise of big data and the increasing adoption of cloud computing are leading to immense demand for data center space. Secondly, government initiatives promoting digital transformation and investment in digital infrastructure are fueling market expansion. Thirdly, advancements in technology, including AI and IoT, necessitate more powerful and efficient data centers, creating lucrative opportunities for construction companies.
Challenges in the North America Data Center Construction Market
The market faces significant challenges, including high construction costs, complex regulatory approvals, and the global chip shortage that impacts the availability of crucial components. Supply chain disruptions and skilled labor shortages further complicate project timelines and budgets. These factors can result in project delays and increased costs, impacting overall market growth. The estimated impact of these challenges on market growth in 2025 is approximately xx Million USD.
Emerging Opportunities in North America Data Center Construction Market
Significant long-term growth opportunities arise from the expansion of edge computing and the growing adoption of sustainable data center designs. Strategic partnerships between data center operators and construction companies are paving the way for innovative solutions. Furthermore, market expansion into underserved regions with emerging digital economies presents exciting potential. Technological breakthroughs in areas such as liquid cooling and AI-powered energy management systems offer further opportunities.
Leading Players in the North America Data Center Construction Market Sector
- Turner Construction Co
- Hensel Phelps Construction Co Inc
- DPR CONSTRUCTION INC
- Clune Construction Company LP
- IBM Corporation
- Holder Construction Company
- Fortis Construction Inc
- Nabholz Construction Corporation
- Rittal GMBH & Co KG
- Hitachi Corporation
- AECOM
- HITT Contrating Inc
- Schneider Electric SE
Key Milestones in North America Data Center Construction Market Industry
- 2020: Increased focus on sustainable data center designs due to growing environmental concerns.
- 2021: Several major M&A activities consolidated market share among leading players.
- 2022: Significant investments in edge computing infrastructure spurred demand for smaller, localized data centers.
- 2023: Launch of several innovative cooling technologies aimed at improving energy efficiency.
- 2024: Growing adoption of modular data center designs to accelerate construction and reduce costs.
Strategic Outlook for North America Data Center Construction Market Market
The North America data center construction market holds immense future potential, driven by sustained technological advancements, increasing data consumption, and government support for digital infrastructure. Strategic opportunities lie in leveraging sustainable practices, embracing technological innovations, and forming strategic alliances to capitalize on the market's continued expansion. The focus on energy efficiency and sustainability will be a crucial factor in determining long-term market leadership.
North America Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Others
-
1.1.2. Power Back up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Others
-
2.2. Power Back up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Others
-
4. Power Back up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier-I and II
- 11.2. Tier-III
- 11.3. Tier-IV
- 12. Tier-I and II
- 13. Tier-III
- 14. Tier-IV
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
-
21. Geography
- 21.1. United States
- 21.2. Canada
- 21.3. Mexico
- 22. United States
- 23. Canada
- 24. Mexico
North America Data Center Construction Market Segmentation By Geography
- 1. United States
- 2. Canada
- 3. Mexico

North America Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 6.20% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1 Growing Cloud Applications
- 3.2.2 AI
- 3.2.3 and Big Data; Growing Adoption of Hyperscale Data Centers in Large Enterprises; Advent Green Data Center
- 3.3. Market Restrains
- 3.3.1 High CaPex
- 3.3.2 OpEx & TCO for building Data Center
- 3.4. Market Trends
- 3.4.1. United States of America to hold major market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Others
- 5.1.1.2. Power Back up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Others
- 5.2.2. Power Back up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Others
- 5.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier-I and II
- 5.11.2. Tier-III
- 5.11.3. Tier-IV
- 5.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 5.13. Market Analysis, Insights and Forecast - by Tier-III
- 5.14. Market Analysis, Insights and Forecast - by Tier-IV
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Geography
- 5.21.1. United States
- 5.21.2. Canada
- 5.21.3. Mexico
- 5.22. Market Analysis, Insights and Forecast - by United States
- 5.23. Market Analysis, Insights and Forecast - by Canada
- 5.24. Market Analysis, Insights and Forecast - by Mexico
- 5.25. Market Analysis, Insights and Forecast - by Region
- 5.25.1. United States
- 5.25.2. Canada
- 5.25.3. Mexico
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. United States North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.1.1.1. Power Distribution Solution
- 6.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.1.1.1.2. Transfer Switches
- 6.1.1.1.2.1. Static
- 6.1.1.1.2.2. Automatic (ATS)
- 6.1.1.1.3. Switchgear
- 6.1.1.1.3.1. Low-Voltage
- 6.1.1.1.3.2. Medium-Voltage
- 6.1.1.1.4. Power Panels and Components
- 6.1.1.1.5. Others
- 6.1.1.2. Power Back up Solutions
- 6.1.1.2.1. UPS
- 6.1.1.2.2. Generators
- 6.1.1.3. Service
- 6.1.1.1. Power Distribution Solution
- 6.1.2. Market Segmentation - By Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.2.1.1. Immersion Cooling
- 6.1.2.1.2. Direct-To-Chip Cooling
- 6.1.2.1.3. Rear Door Heat Exchanger
- 6.1.2.1.4. In-Row and In-Rack Cooling
- 6.1.2.2. Racks
- 6.1.2.3. Other Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.3. General Construction
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 6.2.1. Power Distribution Solution
- 6.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.2.1.2. Transfer Switches
- 6.2.1.2.1. Static
- 6.2.1.2.2. Automatic (ATS)
- 6.2.1.3. Switchgear
- 6.2.1.3.1. Low-Voltage
- 6.2.1.3.2. Medium-Voltage
- 6.2.1.4. Power Panels and Components
- 6.2.1.5. Others
- 6.2.2. Power Back up Solutions
- 6.2.2.1. UPS
- 6.2.2.2. Generators
- 6.2.3. Service
- 6.2.1. Power Distribution Solution
- 6.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 6.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.3.2. Transfer Switches
- 6.3.2.1. Static
- 6.3.2.2. Automatic (ATS)
- 6.3.3. Switchgear
- 6.3.3.1. Low-Voltage
- 6.3.3.2. Medium-Voltage
- 6.3.4. Power Panels and Components
- 6.3.5. Others
- 6.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 6.4.1. UPS
- 6.4.2. Generators
- 6.5. Market Analysis, Insights and Forecast - by Service
- 6.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.6.1.1. Immersion Cooling
- 6.6.1.2. Direct-To-Chip Cooling
- 6.6.1.3. Rear Door Heat Exchanger
- 6.6.1.4. In-Row and In-Rack Cooling
- 6.6.2. Racks
- 6.6.3. Other Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 6.7.1. Immersion Cooling
- 6.7.2. Direct-To-Chip Cooling
- 6.7.3. Rear Door Heat Exchanger
- 6.7.4. In-Row and In-Rack Cooling
- 6.8. Market Analysis, Insights and Forecast - by Racks
- 6.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 6.10. Market Analysis, Insights and Forecast - by General Construction
- 6.11. Market Analysis, Insights and Forecast - by Tier Type
- 6.11.1. Tier-I and II
- 6.11.2. Tier-III
- 6.11.3. Tier-IV
- 6.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 6.13. Market Analysis, Insights and Forecast - by Tier-III
- 6.14. Market Analysis, Insights and Forecast - by Tier-IV
- 6.15. Market Analysis, Insights and Forecast - by End User
- 6.15.1. Banking, Financial Services, and Insurance
- 6.15.2. IT and Telecommunications
- 6.15.3. Government and Defense
- 6.15.4. Healthcare
- 6.15.5. Other End Users
- 6.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 6.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 6.18. Market Analysis, Insights and Forecast - by Government and Defense
- 6.19. Market Analysis, Insights and Forecast - by Healthcare
- 6.20. Market Analysis, Insights and Forecast - by Other End Users
- 6.21. Market Analysis, Insights and Forecast - by Geography
- 6.21.1. United States
- 6.21.2. Canada
- 6.21.3. Mexico
- 6.22. Market Analysis, Insights and Forecast - by United States
- 6.23. Market Analysis, Insights and Forecast - by Canada
- 6.24. Market Analysis, Insights and Forecast - by Mexico
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7. Canada North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.1.1.1. Power Distribution Solution
- 7.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.1.1.1.2. Transfer Switches
- 7.1.1.1.2.1. Static
- 7.1.1.1.2.2. Automatic (ATS)
- 7.1.1.1.3. Switchgear
- 7.1.1.1.3.1. Low-Voltage
- 7.1.1.1.3.2. Medium-Voltage
- 7.1.1.1.4. Power Panels and Components
- 7.1.1.1.5. Others
- 7.1.1.2. Power Back up Solutions
- 7.1.1.2.1. UPS
- 7.1.1.2.2. Generators
- 7.1.1.3. Service
- 7.1.1.1. Power Distribution Solution
- 7.1.2. Market Segmentation - By Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.2.1.1. Immersion Cooling
- 7.1.2.1.2. Direct-To-Chip Cooling
- 7.1.2.1.3. Rear Door Heat Exchanger
- 7.1.2.1.4. In-Row and In-Rack Cooling
- 7.1.2.2. Racks
- 7.1.2.3. Other Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.3. General Construction
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 7.2.1. Power Distribution Solution
- 7.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.2.1.2. Transfer Switches
- 7.2.1.2.1. Static
- 7.2.1.2.2. Automatic (ATS)
- 7.2.1.3. Switchgear
- 7.2.1.3.1. Low-Voltage
- 7.2.1.3.2. Medium-Voltage
- 7.2.1.4. Power Panels and Components
- 7.2.1.5. Others
- 7.2.2. Power Back up Solutions
- 7.2.2.1. UPS
- 7.2.2.2. Generators
- 7.2.3. Service
- 7.2.1. Power Distribution Solution
- 7.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 7.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.3.2. Transfer Switches
- 7.3.2.1. Static
- 7.3.2.2. Automatic (ATS)
- 7.3.3. Switchgear
- 7.3.3.1. Low-Voltage
- 7.3.3.2. Medium-Voltage
- 7.3.4. Power Panels and Components
- 7.3.5. Others
- 7.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 7.4.1. UPS
- 7.4.2. Generators
- 7.5. Market Analysis, Insights and Forecast - by Service
- 7.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.6.1.1. Immersion Cooling
- 7.6.1.2. Direct-To-Chip Cooling
- 7.6.1.3. Rear Door Heat Exchanger
- 7.6.1.4. In-Row and In-Rack Cooling
- 7.6.2. Racks
- 7.6.3. Other Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 7.7.1. Immersion Cooling
- 7.7.2. Direct-To-Chip Cooling
- 7.7.3. Rear Door Heat Exchanger
- 7.7.4. In-Row and In-Rack Cooling
- 7.8. Market Analysis, Insights and Forecast - by Racks
- 7.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 7.10. Market Analysis, Insights and Forecast - by General Construction
- 7.11. Market Analysis, Insights and Forecast - by Tier Type
- 7.11.1. Tier-I and II
- 7.11.2. Tier-III
- 7.11.3. Tier-IV
- 7.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 7.13. Market Analysis, Insights and Forecast - by Tier-III
- 7.14. Market Analysis, Insights and Forecast - by Tier-IV
- 7.15. Market Analysis, Insights and Forecast - by End User
- 7.15.1. Banking, Financial Services, and Insurance
- 7.15.2. IT and Telecommunications
- 7.15.3. Government and Defense
- 7.15.4. Healthcare
- 7.15.5. Other End Users
- 7.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 7.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 7.18. Market Analysis, Insights and Forecast - by Government and Defense
- 7.19. Market Analysis, Insights and Forecast - by Healthcare
- 7.20. Market Analysis, Insights and Forecast - by Other End Users
- 7.21. Market Analysis, Insights and Forecast - by Geography
- 7.21.1. United States
- 7.21.2. Canada
- 7.21.3. Mexico
- 7.22. Market Analysis, Insights and Forecast - by United States
- 7.23. Market Analysis, Insights and Forecast - by Canada
- 7.24. Market Analysis, Insights and Forecast - by Mexico
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8. Mexico North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.1.1.1. Power Distribution Solution
- 8.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.1.1.1.2. Transfer Switches
- 8.1.1.1.2.1. Static
- 8.1.1.1.2.2. Automatic (ATS)
- 8.1.1.1.3. Switchgear
- 8.1.1.1.3.1. Low-Voltage
- 8.1.1.1.3.2. Medium-Voltage
- 8.1.1.1.4. Power Panels and Components
- 8.1.1.1.5. Others
- 8.1.1.2. Power Back up Solutions
- 8.1.1.2.1. UPS
- 8.1.1.2.2. Generators
- 8.1.1.3. Service
- 8.1.1.1. Power Distribution Solution
- 8.1.2. Market Segmentation - By Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.2.1.1. Immersion Cooling
- 8.1.2.1.2. Direct-To-Chip Cooling
- 8.1.2.1.3. Rear Door Heat Exchanger
- 8.1.2.1.4. In-Row and In-Rack Cooling
- 8.1.2.2. Racks
- 8.1.2.3. Other Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.3. General Construction
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 8.2.1. Power Distribution Solution
- 8.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.2.1.2. Transfer Switches
- 8.2.1.2.1. Static
- 8.2.1.2.2. Automatic (ATS)
- 8.2.1.3. Switchgear
- 8.2.1.3.1. Low-Voltage
- 8.2.1.3.2. Medium-Voltage
- 8.2.1.4. Power Panels and Components
- 8.2.1.5. Others
- 8.2.2. Power Back up Solutions
- 8.2.2.1. UPS
- 8.2.2.2. Generators
- 8.2.3. Service
- 8.2.1. Power Distribution Solution
- 8.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 8.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.3.2. Transfer Switches
- 8.3.2.1. Static
- 8.3.2.2. Automatic (ATS)
- 8.3.3. Switchgear
- 8.3.3.1. Low-Voltage
- 8.3.3.2. Medium-Voltage
- 8.3.4. Power Panels and Components
- 8.3.5. Others
- 8.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 8.4.1. UPS
- 8.4.2. Generators
- 8.5. Market Analysis, Insights and Forecast - by Service
- 8.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.6.1.1. Immersion Cooling
- 8.6.1.2. Direct-To-Chip Cooling
- 8.6.1.3. Rear Door Heat Exchanger
- 8.6.1.4. In-Row and In-Rack Cooling
- 8.6.2. Racks
- 8.6.3. Other Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 8.7.1. Immersion Cooling
- 8.7.2. Direct-To-Chip Cooling
- 8.7.3. Rear Door Heat Exchanger
- 8.7.4. In-Row and In-Rack Cooling
- 8.8. Market Analysis, Insights and Forecast - by Racks
- 8.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 8.10. Market Analysis, Insights and Forecast - by General Construction
- 8.11. Market Analysis, Insights and Forecast - by Tier Type
- 8.11.1. Tier-I and II
- 8.11.2. Tier-III
- 8.11.3. Tier-IV
- 8.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 8.13. Market Analysis, Insights and Forecast - by Tier-III
- 8.14. Market Analysis, Insights and Forecast - by Tier-IV
- 8.15. Market Analysis, Insights and Forecast - by End User
- 8.15.1. Banking, Financial Services, and Insurance
- 8.15.2. IT and Telecommunications
- 8.15.3. Government and Defense
- 8.15.4. Healthcare
- 8.15.5. Other End Users
- 8.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 8.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 8.18. Market Analysis, Insights and Forecast - by Government and Defense
- 8.19. Market Analysis, Insights and Forecast - by Healthcare
- 8.20. Market Analysis, Insights and Forecast - by Other End Users
- 8.21. Market Analysis, Insights and Forecast - by Geography
- 8.21.1. United States
- 8.21.2. Canada
- 8.21.3. Mexico
- 8.22. Market Analysis, Insights and Forecast - by United States
- 8.23. Market Analysis, Insights and Forecast - by Canada
- 8.24. Market Analysis, Insights and Forecast - by Mexico
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 9. United States North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Canada North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Mexico North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Rest of North America North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 13. Competitive Analysis
- 13.1. Market Share Analysis 2024
- 13.2. Company Profiles
- 13.2.1 Turner Construction Co
- 13.2.1.1. Overview
- 13.2.1.2. Products
- 13.2.1.3. SWOT Analysis
- 13.2.1.4. Recent Developments
- 13.2.1.5. Financials (Based on Availability)
- 13.2.2 Hensel Phelps Construction Co Inc
- 13.2.2.1. Overview
- 13.2.2.2. Products
- 13.2.2.3. SWOT Analysis
- 13.2.2.4. Recent Developments
- 13.2.2.5. Financials (Based on Availability)
- 13.2.3 DPR CONSTRUCTION INC
- 13.2.3.1. Overview
- 13.2.3.2. Products
- 13.2.3.3. SWOT Analysis
- 13.2.3.4. Recent Developments
- 13.2.3.5. Financials (Based on Availability)
- 13.2.4 Clune Construction Company LP
- 13.2.4.1. Overview
- 13.2.4.2. Products
- 13.2.4.3. SWOT Analysis
- 13.2.4.4. Recent Developments
- 13.2.4.5. Financials (Based on Availability)
- 13.2.5 IBM Corporation
- 13.2.5.1. Overview
- 13.2.5.2. Products
- 13.2.5.3. SWOT Analysis
- 13.2.5.4. Recent Developments
- 13.2.5.5. Financials (Based on Availability)
- 13.2.6 Holder Construction Company
- 13.2.6.1. Overview
- 13.2.6.2. Products
- 13.2.6.3. SWOT Analysis
- 13.2.6.4. Recent Developments
- 13.2.6.5. Financials (Based on Availability)
- 13.2.7 Fortis Construction Inc
- 13.2.7.1. Overview
- 13.2.7.2. Products
- 13.2.7.3. SWOT Analysis
- 13.2.7.4. Recent Developments
- 13.2.7.5. Financials (Based on Availability)
- 13.2.8 Nabholz Construction Corporation
- 13.2.8.1. Overview
- 13.2.8.2. Products
- 13.2.8.3. SWOT Analysis
- 13.2.8.4. Recent Developments
- 13.2.8.5. Financials (Based on Availability)
- 13.2.9 Rittal GMBH & Co KG
- 13.2.9.1. Overview
- 13.2.9.2. Products
- 13.2.9.3. SWOT Analysis
- 13.2.9.4. Recent Developments
- 13.2.9.5. Financials (Based on Availability)
- 13.2.10 Hitachi Corporation
- 13.2.10.1. Overview
- 13.2.10.2. Products
- 13.2.10.3. SWOT Analysis
- 13.2.10.4. Recent Developments
- 13.2.10.5. Financials (Based on Availability)
- 13.2.11 AECOM
- 13.2.11.1. Overview
- 13.2.11.2. Products
- 13.2.11.3. SWOT Analysis
- 13.2.11.4. Recent Developments
- 13.2.11.5. Financials (Based on Availability)
- 13.2.12 HITT Contrating Inc
- 13.2.12.1. Overview
- 13.2.12.2. Products
- 13.2.12.3. SWOT Analysis
- 13.2.12.4. Recent Developments
- 13.2.12.5. Financials (Based on Availability)
- 13.2.13 Schneider Electric SE
- 13.2.13.1. Overview
- 13.2.13.2. Products
- 13.2.13.3. SWOT Analysis
- 13.2.13.4. Recent Developments
- 13.2.13.5. Financials (Based on Availability)
- 13.2.1 Turner Construction Co
List of Figures
- Figure 1: North America Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: North America Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: North America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: North America Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 10: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 11: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 18: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 19: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 20: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 21: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 22: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 23: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 24: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 25: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 26: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 27: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 28: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 29: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 30: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 31: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 32: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 33: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 34: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 35: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 36: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 37: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 38: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 39: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 40: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 41: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 42: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 43: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 44: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 45: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 46: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 47: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 48: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 49: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 50: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 51: North America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 52: North America Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 53: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 54: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 55: United States North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 56: United States North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 57: Canada North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 58: Canada North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 59: Mexico North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 60: Mexico North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 61: Rest of North America North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 62: Rest of North America North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 63: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 64: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 65: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 66: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 67: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 68: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 69: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 70: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 71: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 72: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 73: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 74: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 75: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 76: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 77: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 78: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 79: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 80: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 81: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 82: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 83: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 84: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 85: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 86: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 87: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 88: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 89: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 90: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 91: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 92: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 93: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 94: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 95: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 96: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 97: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 98: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 99: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 100: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 101: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 102: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 103: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 104: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 105: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 106: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 107: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 108: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 109: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 110: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 111: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 112: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 113: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 114: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 115: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 116: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 117: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 118: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 119: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 120: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 121: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 122: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 123: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 124: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 125: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 126: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 127: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 128: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 129: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 130: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 131: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 132: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 133: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 134: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 135: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 136: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 137: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 138: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 139: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 140: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 141: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 142: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 143: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 144: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 145: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 146: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 147: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 148: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 149: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 150: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 151: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 152: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 153: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 154: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 155: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 156: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 157: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 158: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 159: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 160: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 161: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 162: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 163: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 164: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 165: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 166: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 167: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 168: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 169: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 170: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 171: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 172: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 173: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 174: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 175: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 176: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 177: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 178: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 179: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 180: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 181: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 182: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 183: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 184: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 185: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 186: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 187: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 188: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 189: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 190: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 191: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 192: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 193: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 194: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 195: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 196: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 197: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 198: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 199: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 200: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 201: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 202: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 203: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 204: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 205: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 206: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 207: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 208: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 209: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 210: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 211: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 212: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the North America Data Center Construction Market?
The projected CAGR is approximately 6.20%.
2. Which companies are prominent players in the North America Data Center Construction Market?
Key companies in the market include Turner Construction Co, Hensel Phelps Construction Co Inc, DPR CONSTRUCTION INC, Clune Construction Company LP, IBM Corporation, Holder Construction Company, Fortis Construction Inc, Nabholz Construction Corporation, Rittal GMBH & Co KG, Hitachi Corporation, AECOM, HITT Contrating Inc, Schneider Electric SE.
3. What are the main segments of the North America Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back up Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier-I and II, Tier-III, Tier-IV, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users, Geography, United States, Canada, Mexico.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Growing Cloud Applications. AI. and Big Data; Growing Adoption of Hyperscale Data Centers in Large Enterprises; Advent Green Data Center.
6. What are the notable trends driving market growth?
United States of America to hold major market share.
7. Are there any restraints impacting market growth?
High CaPex. OpEx & TCO for building Data Center.
8. Can you provide examples of recent developments in the market?
N/A
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 5250, and USD 8750 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "North America Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the North America Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the North America Data Center Construction Market?
To stay informed about further developments, trends, and reports in the North America Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence