Key Insights
The Japan data center construction market is experiencing robust growth, driven by the increasing adoption of cloud computing, digital transformation initiatives across various sectors, and the burgeoning demand for high-speed internet connectivity. The market, estimated at $XX million in 2025 (assuming a reasonable market size based on global trends and the provided CAGR), is projected to expand at a Compound Annual Growth Rate (CAGR) of 3.25% from 2025 to 2033. This growth is fueled by significant investments from both domestic and international players in expanding data center infrastructure to support the nation's digital economy. Key growth drivers include the rising demand for edge computing, the proliferation of IoT devices, and government initiatives promoting digitalization. The market is segmented by tier type (Tier 1, Tier 2, Tier 3, Tier 4), data center size (small, medium, large, mega, massive), infrastructure components (cooling, power, racks, servers, networking, security, design/consulting, other), and end-user sectors (IT & Telecommunication, BFSI, Government, Healthcare, others). The Kanto region, being the economic and technological hub, holds a significant market share, followed by Kansai and Chubu.
Despite the positive outlook, the market faces certain restraints, primarily related to land scarcity and high construction costs in major metropolitan areas like Tokyo. Stringent regulations concerning environmental sustainability and energy efficiency also pose challenges. However, innovative cooling technologies and the adoption of sustainable building practices are mitigating these issues to some degree. The competitive landscape includes both international giants like IBM and Schneider Electric, and local construction and engineering firms like Daiwa House Industry and Obayashi Corporation, indicating a dynamic market with opportunities for both established and emerging players. The increasing demand for colocation services further drives the need for expanding data center capacity within Japan, resulting in continuous market expansion. The forecast period, 2025-2033, promises further market consolidation and increased technological advancements within the data center construction sector in Japan.

Japan Data Center Construction Market: A Comprehensive Report (2019-2033)
This comprehensive report provides an in-depth analysis of the Japan Data Center Construction Market, offering invaluable insights for industry stakeholders, investors, and strategic decision-makers. Covering the period from 2019 to 2033, with a base year of 2025, this report meticulously examines market dynamics, trends, leading players, and future growth prospects. The market is projected to reach xx Million by 2033, exhibiting a CAGR of xx% during the forecast period (2025-2033).
Japan Data Center Construction Market Dynamics & Concentration
The Japan data center construction market is characterized by a moderately concentrated landscape, with a few major players holding significant market share. Market concentration is influenced by factors like technological advancements, regulatory frameworks, and the prevalence of mergers and acquisitions (M&A). The market share of the top 5 players is estimated at xx%, while the remaining xx% is distributed among numerous smaller players. Innovation in cooling technologies, power infrastructure, and security systems are key drivers, while stringent regulatory compliance and environmental concerns shape market dynamics. Product substitutes, such as cloud-based solutions, present a competitive challenge, although the need for on-premise data centers remains strong due to data sovereignty, latency concerns, and specialized applications. End-user trends indicate a shift towards larger data center deployments, particularly within IT & Telecommunication and BFSI sectors, driving demand for mega and massive data centers. M&A activity in the period 2019-2024 registered xx deals, reflecting consolidation trends and expansion strategies of major players.
- Market Share: Top 5 players: xx%; Others: xx%
- M&A Deal Count (2019-2024): xx
- Key Innovation Drivers: Advancements in cooling, power infrastructure, and security.
- Regulatory Impact: Stringent compliance requirements and environmental regulations.
- End-User Trends: Increasing demand for larger data centers from IT & Telecommunication and BFSI.
Japan Data Center Construction Market Industry Trends & Analysis
The Japanese data center construction market is experiencing robust growth fueled by several factors. The increasing adoption of digital technologies across various sectors, coupled with the growing need for robust data storage and processing capabilities, is a primary driver. Government initiatives promoting digital transformation further stimulate market expansion. Technological disruptions, such as the rise of edge computing and AI, are reshaping the data center landscape, driving demand for specialized infrastructure and services. Consumer preferences are shifting towards higher levels of data security and sustainability, influencing design and construction practices. Competitive dynamics are marked by intense rivalry among established players and the emergence of new entrants offering innovative solutions. Market penetration of advanced cooling technologies, such as liquid cooling, is growing steadily. The market is projected to grow at a CAGR of xx% during the forecast period, driven by increased investment in infrastructure projects and rising digital adoption across various industry verticals.

Leading Markets & Segments in Japan Data Center Construction Market
The Tokyo metropolitan area dominates the Japan data center construction market, owing to its robust infrastructure, concentration of businesses, and skilled workforce. Tier 1 data centers constitute a significant segment, reflecting the growing demand for high-availability and resilience. Large and Mega data center sizes are experiencing the most rapid growth, driven by the increasing data storage needs of large enterprises. The IT & Telecommunication sector is the leading end-user, followed by BFSI. Power infrastructure and cooling infrastructure are the largest segments in terms of market value, while design and consulting services are also crucial elements of the market.
- Key Drivers for Tokyo Dominance: Robust infrastructure, business concentration, skilled workforce.
- Dominant Segments: Tier 1 data centers; Large & Mega data center sizes; IT & Telecommunication end-user; Power & Cooling Infrastructure.
- Other Significant Segments: BFSI end-user; Design & Consulting Services.
Japan Data Center Construction Market Product Developments
Recent product developments focus on energy-efficient cooling solutions, modular data center designs, and advanced security systems. These innovations aim to reduce operational costs, improve efficiency, and enhance data security. The market is witnessing a strong uptake of prefabricated modular data centers, enabling faster deployment and reduced construction time. These developments enhance market competitiveness and address evolving customer needs for cost-effectiveness, speed of deployment, and enhanced security.
Key Drivers of Japan Data Center Construction Market Growth
Several factors contribute to the growth of the Japan data center construction market. Firstly, the increasing penetration of digital technologies across sectors, coupled with substantial investments in digital infrastructure by the government, boosts market expansion. Secondly, a rise in cloud computing adoption necessitates robust data center infrastructure. Lastly, stringent data privacy regulations and the need for localized data storage propel further growth.
Challenges in the Japan Data Center Construction Market Market
The market faces challenges such as land scarcity in major urban areas, high construction costs, and the complexities of securing necessary permits and approvals. Supply chain disruptions and the global semiconductor shortage also impact project timelines and costs. Intense competition among established players and emerging players pose further challenges. These factors contribute to increased project costs and prolonged delivery times.
Emerging Opportunities in Japan Data Center Construction Market
The market presents opportunities in areas like sustainable data center design and construction, leveraging renewable energy sources and implementing energy-efficient technologies. Strategic partnerships between data center operators and infrastructure providers can accelerate market growth. Expansion into regional areas outside of major cities could unlock new growth avenues by addressing growing demand outside core urban areas.
Leading Players in the Japan Data Center Construction Market Sector
- SAS Institute Inc
- Fortis Construction
- Daiwa House Industry Co Ltd
- Hutchinson Builders
- Kienta Engineering Construction
- DSCO Group
- IBM Corporation
- GIGA-BYTE Technology Co Ltd
- Sato Kogyo (S) Pte Ltd
- Nakano Corporation
- Schneider Electric SE
- Turner Construction Co
- Hensel Phelps Construction Co Inc
- Obayashi Corporation
- CSF Group
- HIBIYA ENGINEERING Ltd
- Cummins Inc
- AECOM
- NTT Ltd
Key Milestones in Japan Data Center Construction Market Industry
- November 2022: Equinix announces its 15th IBX data center in Tokyo, investing USD 115 Million, with initial capacity of 1,200 cabinets, expanding to 3,700. This signifies major investment and capacity expansion in the market.
- September 2022: NTT Corporation invests JPY 40 billion in a new Keihanna Data Center in Kyoto Prefecture, providing 30 MW capacity and 4,800 rack spaces. This highlights significant expansion by a major player.
Strategic Outlook for Japan Data Center Construction Market Market
The future of the Japan data center construction market is promising, driven by ongoing digital transformation, increasing data volumes, and growing demand for high-performance computing. Strategic partnerships, investments in sustainable technologies, and expansion into regional markets will shape the market landscape. The focus on energy efficiency and sustainable practices presents significant growth opportunities for innovative players.
Japan Data Center Construction Market Segmentation
-
1. Market Segmentation
-
1.1. By Infrastructure
-
1.1.1. By Electrical Infrastructure
-
1.1.1.1. Power Distribution Solutions
- 1.1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
1.1.1.1.2. Transfer Switches
- 1.1.1.1.2.1. Static
- 1.1.1.1.2.2. Automatic (ATS)
-
1.1.1.1.3. Switchgear
- 1.1.1.1.3.1. Low-voltage
- 1.1.1.1.3.2. Medium-voltage
- 1.1.1.1.4. Power Panels and Components
- 1.1.1.1.5. Other Power Distribution Solutions
-
1.1.1.2. Power Back-up Solutions
- 1.1.1.2.1. UPS
- 1.1.1.2.2. Generators
- 1.1.1.3. Service
-
1.1.1.1. Power Distribution Solutions
-
1.1.2. By Mechanical Infrastructure
-
1.1.2.1. Cooling Systems
- 1.1.2.1.1. Immersion Cooling
- 1.1.2.1.2. Direct-to-Chip Cooling
- 1.1.2.1.3. Rear Door Heat Exchanger
- 1.1.2.1.4. In-row and In-rack Cooling
- 1.1.2.1.5. Racks
- 1.1.2.1.6. Other Mechanical Infrastructure
-
1.1.2.1. Cooling Systems
- 1.1.3. General Construction
-
1.1.1. By Electrical Infrastructure
-
1.2. By Tier Type
- 1.2.1. Tier-I and II
- 1.2.2. Tier-III
- 1.2.3. Tier-IV
-
1.3. By End User
- 1.3.1. Banking, Financial Services, and Insurance
- 1.3.2. IT and Telecommunications
- 1.3.3. Government and Defense
- 1.3.4. Healthcare
- 1.3.5. Other End Users
-
1.1. By Infrastructure
-
2. Infrastructure
-
2.1. By Electrical Infrastructure
-
2.1.1. Power Distribution Solutions
- 2.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
2.1.1.2. Transfer Switches
- 2.1.1.2.1. Static
- 2.1.1.2.2. Automatic (ATS)
-
2.1.1.3. Switchgear
- 2.1.1.3.1. Low-voltage
- 2.1.1.3.2. Medium-voltage
- 2.1.1.4. Power Panels and Components
- 2.1.1.5. Other Power Distribution Solutions
-
2.1.2. Power Back-up Solutions
- 2.1.2.1. UPS
- 2.1.2.2. Generators
- 2.1.3. Service
-
2.1.1. Power Distribution Solutions
-
2.2. By Mechanical Infrastructure
-
2.2.1. Cooling Systems
- 2.2.1.1. Immersion Cooling
- 2.2.1.2. Direct-to-Chip Cooling
- 2.2.1.3. Rear Door Heat Exchanger
- 2.2.1.4. In-row and In-rack Cooling
- 2.2.1.5. Racks
- 2.2.1.6. Other Mechanical Infrastructure
-
2.2.1. Cooling Systems
- 2.3. General Construction
-
2.1. By Electrical Infrastructure
-
3. Tier Type
- 3.1. Tier-I and II
- 3.2. Tier-III
- 3.3. Tier-IV
-
4. End User
- 4.1. Banking, Financial Services, and Insurance
- 4.2. IT and Telecommunications
- 4.3. Government and Defense
- 4.4. Healthcare
- 4.5. Other End Users
Japan Data Center Construction Market Segmentation By Geography
- 1. Japan

Japan Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 3.25% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Growing E-commerce and Hi-tech industries driving the DC construction in the country; Major initiatives undertaken by government to promote digital economy and connectivity infrastructure
- 3.3. Market Restrains
- 3.3.1. High Power Consumption and emission contribution of Data Centers
- 3.4. Market Trends
- 3.4.1. Tier 3 is the largest Tier Type
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Market Segmentation
- 5.1.1. By Infrastructure
- 5.1.1.1. By Electrical Infrastructure
- 5.1.1.1.1. Power Distribution Solutions
- 5.1.1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.1.1.1.1.2. Transfer Switches
- 5.1.1.1.1.2.1. Static
- 5.1.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.1.3. Switchgear
- 5.1.1.1.1.3.1. Low-voltage
- 5.1.1.1.1.3.2. Medium-voltage
- 5.1.1.1.1.4. Power Panels and Components
- 5.1.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.1.2. Power Back-up Solutions
- 5.1.1.1.2.1. UPS
- 5.1.1.1.2.2. Generators
- 5.1.1.1.3. Service
- 5.1.1.1.1. Power Distribution Solutions
- 5.1.1.2. By Mechanical Infrastructure
- 5.1.1.2.1. Cooling Systems
- 5.1.1.2.1.1. Immersion Cooling
- 5.1.1.2.1.2. Direct-to-Chip Cooling
- 5.1.1.2.1.3. Rear Door Heat Exchanger
- 5.1.1.2.1.4. In-row and In-rack Cooling
- 5.1.1.2.1.5. Racks
- 5.1.1.2.1.6. Other Mechanical Infrastructure
- 5.1.1.2.1. Cooling Systems
- 5.1.1.3. General Construction
- 5.1.1.1. By Electrical Infrastructure
- 5.1.2. By Tier Type
- 5.1.2.1. Tier-I and II
- 5.1.2.2. Tier-III
- 5.1.2.3. Tier-IV
- 5.1.3. By End User
- 5.1.3.1. Banking, Financial Services, and Insurance
- 5.1.3.2. IT and Telecommunications
- 5.1.3.3. Government and Defense
- 5.1.3.4. Healthcare
- 5.1.3.5. Other End Users
- 5.1.1. By Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Infrastructure
- 5.2.1. By Electrical Infrastructure
- 5.2.1.1. Power Distribution Solutions
- 5.2.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.2.1.1.2. Transfer Switches
- 5.2.1.1.2.1. Static
- 5.2.1.1.2.2. Automatic (ATS)
- 5.2.1.1.3. Switchgear
- 5.2.1.1.3.1. Low-voltage
- 5.2.1.1.3.2. Medium-voltage
- 5.2.1.1.4. Power Panels and Components
- 5.2.1.1.5. Other Power Distribution Solutions
- 5.2.1.2. Power Back-up Solutions
- 5.2.1.2.1. UPS
- 5.2.1.2.2. Generators
- 5.2.1.3. Service
- 5.2.1.1. Power Distribution Solutions
- 5.2.2. By Mechanical Infrastructure
- 5.2.2.1. Cooling Systems
- 5.2.2.1.1. Immersion Cooling
- 5.2.2.1.2. Direct-to-Chip Cooling
- 5.2.2.1.3. Rear Door Heat Exchanger
- 5.2.2.1.4. In-row and In-rack Cooling
- 5.2.2.1.5. Racks
- 5.2.2.1.6. Other Mechanical Infrastructure
- 5.2.2.1. Cooling Systems
- 5.2.3. General Construction
- 5.2.1. By Electrical Infrastructure
- 5.3. Market Analysis, Insights and Forecast - by Tier Type
- 5.3.1. Tier-I and II
- 5.3.2. Tier-III
- 5.3.3. Tier-IV
- 5.4. Market Analysis, Insights and Forecast - by End User
- 5.4.1. Banking, Financial Services, and Insurance
- 5.4.2. IT and Telecommunications
- 5.4.3. Government and Defense
- 5.4.4. Healthcare
- 5.4.5. Other End Users
- 5.5. Market Analysis, Insights and Forecast - by Region
- 5.5.1. Japan
- 5.1. Market Analysis, Insights and Forecast - by Market Segmentation
- 6. Kanto Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7. Kansai Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8. Chubu Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 9. Kyushu Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Tohoku Japan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Competitive Analysis
- 11.1. Market Share Analysis 2024
- 11.2. Company Profiles
- 11.2.1 SAS Institute Inc
- 11.2.1.1. Overview
- 11.2.1.2. Products
- 11.2.1.3. SWOT Analysis
- 11.2.1.4. Recent Developments
- 11.2.1.5. Financials (Based on Availability)
- 11.2.2 Fortis Construction
- 11.2.2.1. Overview
- 11.2.2.2. Products
- 11.2.2.3. SWOT Analysis
- 11.2.2.4. Recent Developments
- 11.2.2.5. Financials (Based on Availability)
- 11.2.3 Daiwa House Industry Co Ltd
- 11.2.3.1. Overview
- 11.2.3.2. Products
- 11.2.3.3. SWOT Analysis
- 11.2.3.4. Recent Developments
- 11.2.3.5. Financials (Based on Availability)
- 11.2.4 Hutchinson Builders
- 11.2.4.1. Overview
- 11.2.4.2. Products
- 11.2.4.3. SWOT Analysis
- 11.2.4.4. Recent Developments
- 11.2.4.5. Financials (Based on Availability)
- 11.2.5 Kienta Engineering Construction
- 11.2.5.1. Overview
- 11.2.5.2. Products
- 11.2.5.3. SWOT Analysis
- 11.2.5.4. Recent Developments
- 11.2.5.5. Financials (Based on Availability)
- 11.2.6 DSCO Group
- 11.2.6.1. Overview
- 11.2.6.2. Products
- 11.2.6.3. SWOT Analysis
- 11.2.6.4. Recent Developments
- 11.2.6.5. Financials (Based on Availability)
- 11.2.7 IBM Corporation
- 11.2.7.1. Overview
- 11.2.7.2. Products
- 11.2.7.3. SWOT Analysis
- 11.2.7.4. Recent Developments
- 11.2.7.5. Financials (Based on Availability)
- 11.2.8 GIGA-BYTE Technology Co Ltd
- 11.2.8.1. Overview
- 11.2.8.2. Products
- 11.2.8.3. SWOT Analysis
- 11.2.8.4. Recent Developments
- 11.2.8.5. Financials (Based on Availability)
- 11.2.9 Sato Kogyo (S) Pte Ltd
- 11.2.9.1. Overview
- 11.2.9.2. Products
- 11.2.9.3. SWOT Analysis
- 11.2.9.4. Recent Developments
- 11.2.9.5. Financials (Based on Availability)
- 11.2.10 Nakano Corporation
- 11.2.10.1. Overview
- 11.2.10.2. Products
- 11.2.10.3. SWOT Analysis
- 11.2.10.4. Recent Developments
- 11.2.10.5. Financials (Based on Availability)
- 11.2.11 Schneider Electric SE
- 11.2.11.1. Overview
- 11.2.11.2. Products
- 11.2.11.3. SWOT Analysis
- 11.2.11.4. Recent Developments
- 11.2.11.5. Financials (Based on Availability)
- 11.2.12 Turner Construction Co
- 11.2.12.1. Overview
- 11.2.12.2. Products
- 11.2.12.3. SWOT Analysis
- 11.2.12.4. Recent Developments
- 11.2.12.5. Financials (Based on Availability)
- 11.2.13 Hensel Phelps Construction Co Inc
- 11.2.13.1. Overview
- 11.2.13.2. Products
- 11.2.13.3. SWOT Analysis
- 11.2.13.4. Recent Developments
- 11.2.13.5. Financials (Based on Availability)
- 11.2.14 Obayashi Corporation
- 11.2.14.1. Overview
- 11.2.14.2. Products
- 11.2.14.3. SWOT Analysis
- 11.2.14.4. Recent Developments
- 11.2.14.5. Financials (Based on Availability)
- 11.2.15 CSF Group
- 11.2.15.1. Overview
- 11.2.15.2. Products
- 11.2.15.3. SWOT Analysis
- 11.2.15.4. Recent Developments
- 11.2.15.5. Financials (Based on Availability)
- 11.2.16 HIBIYA ENGINEERINGLtd
- 11.2.16.1. Overview
- 11.2.16.2. Products
- 11.2.16.3. SWOT Analysis
- 11.2.16.4. Recent Developments
- 11.2.16.5. Financials (Based on Availability)
- 11.2.17 Cummins Inc
- 11.2.17.1. Overview
- 11.2.17.2. Products
- 11.2.17.3. SWOT Analysis
- 11.2.17.4. Recent Developments
- 11.2.17.5. Financials (Based on Availability)
- 11.2.18 AECOM
- 11.2.18.1. Overview
- 11.2.18.2. Products
- 11.2.18.3. SWOT Analysis
- 11.2.18.4. Recent Developments
- 11.2.18.5. Financials (Based on Availability)
- 11.2.19 NTT Ltd
- 11.2.19.1. Overview
- 11.2.19.2. Products
- 11.2.19.3. SWOT Analysis
- 11.2.19.4. Recent Developments
- 11.2.19.5. Financials (Based on Availability)
- 11.2.1 SAS Institute Inc
List of Figures
- Figure 1: Japan Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Japan Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Japan Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Japan Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: Japan Data Center Construction Market Revenue Million Forecast, by Market Segmentation 2019 & 2032
- Table 4: Japan Data Center Construction Market Volume K Unit Forecast, by Market Segmentation 2019 & 2032
- Table 5: Japan Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 6: Japan Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 7: Japan Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 8: Japan Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 9: Japan Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 10: Japan Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 11: Japan Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 12: Japan Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 13: Japan Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 14: Japan Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 15: Kanto Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 16: Kanto Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 17: Kansai Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 18: Kansai Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 19: Chubu Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 20: Chubu Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 21: Kyushu Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 22: Kyushu Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 23: Tohoku Japan Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 24: Tohoku Japan Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 25: Japan Data Center Construction Market Revenue Million Forecast, by Market Segmentation 2019 & 2032
- Table 26: Japan Data Center Construction Market Volume K Unit Forecast, by Market Segmentation 2019 & 2032
- Table 27: Japan Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 28: Japan Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 29: Japan Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 30: Japan Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 31: Japan Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 32: Japan Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 33: Japan Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 34: Japan Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Japan Data Center Construction Market?
The projected CAGR is approximately 3.25%.
2. Which companies are prominent players in the Japan Data Center Construction Market?
Key companies in the market include SAS Institute Inc, Fortis Construction, Daiwa House Industry Co Ltd, Hutchinson Builders, Kienta Engineering Construction, DSCO Group, IBM Corporation, GIGA-BYTE Technology Co Ltd, Sato Kogyo (S) Pte Ltd, Nakano Corporation, Schneider Electric SE, Turner Construction Co, Hensel Phelps Construction Co Inc, Obayashi Corporation, CSF Group, HIBIYA ENGINEERINGLtd, Cummins Inc, AECOM, NTT Ltd.
3. What are the main segments of the Japan Data Center Construction Market?
The market segments include Market Segmentation, Infrastructure, Tier Type, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Growing E-commerce and Hi-tech industries driving the DC construction in the country; Major initiatives undertaken by government to promote digital economy and connectivity infrastructure.
6. What are the notable trends driving market growth?
Tier 3 is the largest Tier Type.
7. Are there any restraints impacting market growth?
High Power Consumption and emission contribution of Data Centers.
8. Can you provide examples of recent developments in the market?
November 2022: Equinix announced its 15th international business exchange (IBX) data center in Tokyo, Japan. The company said that it had made an initial investment of USD 115 million on the new data center, touted TY15. The first phase of TY15 is expected to provide an initial capacity of approximately 1,200 cabinets and 3,700 cabinets when fully built out. Such investments provide opportunities for the vendors in the market.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Japan Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Japan Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Japan Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Japan Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence